Tuesday, 15 April 2014

FINAL YEAR CSE PROJECT EVALUATION NOTICE

Final year students of CSE, please click on the link below to get details of your project evaluation notice. Your attendance is compulsory for this. No excuses shall be entertained.

CLICK ON THIS LINK FOR IMPORTANT PROJECT NOTICE

Thursday, 10 April 2014

PLACEMENT NOTICE

               
                                                                                              10/04/2014

Company Name: ICICI Prudential

Eligibility: Specialization:  BBA/B.Com/MBA (Marketing/Finance)

Date of drive: 15/04/2014 

Time: 9:00am (Sharp)

Venue details: Jain College of Engineering, T. S Nagar, Hunchanhatti cross, Machhe, Belgaum.


Profile Details:

Designation
Compensation*
Benefits
Available job locations
Financial Services Consultant
Rs 1.5 L – 3 L
+
performance linked incentives
Medi claim – Rs 3.5 L
Group Term Insurance – Rs 5 L
Across Karnataka

Job Details:

Financial Services Consultant
Responsible for business through lead generation and references
Responsible for business through pre-fixed appointments provided by the company
Ensure achievement of sales target

 CTC:  Rs. 18000 – Rs.20000/month for MBA post graduates and Rs. 14000 – Rs. 16000 for graduates.

*Students should carry their college ID and relevant documents along with 3 copies of latest resumes.


Sunday, 6 April 2014

CSE Project Evaluation Phase One - Comments

All projects evaluated in the first round shall be given a feedback.

GROUP LEAF DISEASE

  • SRS, SDS incorrect and carelessly done
  • Have no clue about algorithm implementation and data structures to be used
  • Coding for algorithm not completed
  • Project batch seems to be living in a fool's world
  • Little chance of project getting completed

GROUP MEDICAL GUIDELINE

  • Group has vague idea about the project
  • Partial SRS was given. 
  • Seem to have no action plan to complete
  • Have not done enough work in understanding implementation challenges
  • Design concept poor
  • Validation have no clue
  • DBMS usage confusing
GROUP CRIME DATABASE
  • NO SRS AND SDS
  • No design and plan of implementation ready
  • Project coding not commenced due to lack of conceptual clarity
  • Project is in a mess. Difficult to see if being completed on time
  • Project status is ICU case
GROUP LIBRARY
  • SRS not upto expectation
  • SDS is good
  • Need to de-normalize tables
  • Project execution needs to speed up
  • Forms need to be reworked after DBMS changes
GROUP TIME TABLE
  • Poor quality SRS SDS
  • Coding has not commenced
  • Difficult to see the project getting completed

GROUP RETINA ID

  • Quality of submitted documents was poor. Looks like it was just a formality.
  • Group does not have a Design document which can be converted to code. SRS is sketchy and incomplete
  • Group not clear why they have chosen OOAD
  • Not sure about implementation algorithm and how an image is going to be stored (format) and its analysis for identification
  • Project scope is vague
  • Some coding has commenced.
  • Difficult to see the project implementation and report getting done prior to end of term
  • Group needs to get their documents proof read before submission.


GROUP GEOTAX 

  • Complete Design document was not presented. Low level design of business logic and database objects not done.
  • Batch seems more keen on just coding without having a proper design in place.
  • Database concepts leave a lot to be desired
  • Batch seems impervious to suggestions and gives the impression that the department needs to accept whatever they do or say is right.
HEALTHCARE MANAGEMENT
  • The two members who were present seemed to have very little awareness about the project design
  • They came up with a excuse that they have already presented 3-4 times in the past.
  • Project functionality knowledge is sorely lacking in the team present. 
  • The project is database dependent but the members present do have have the basic concepts in place. 
  • No design document in printed form was handed over as required.
  • The two members present seem to be just members of the batch without active involvement.
  • One of the batch members Mr. Nimesh Javali was absent without seeking due permission. He expects the department to pamper to his whims and fancies.
  • Batch needs a drastic change in their attitude. They seem to indicate a attitude of department instructions do not matter to them.


Thursday, 3 April 2014

FINAL YEAR CSE PROJECT EVALUATION PHASE ONE

All students of Final year CSE are hereby notified that the evaluation of their project shall be done per the dates detailed in the document below. 

All batch members are required to be present and explain the status of your project (code). Show hard copy of SRS, Design and Literature Survey. Absence shall not be excused.

CLICK ON THIS LINK TO DOWNLOAD THE DOCUMENT

Friday, 28 March 2014

Angadi Institute of Technology & Management
Department of Computer Science

N O T I C E

This is to bring to the attention of students of 8th Semester (CSE) that you had voluntarily registered for the pooled campus placement of Robosoft Technologies at BVB College Hubli. It is reported that except 6 students others failed to attend the campus placement.

In order to facilitate the placement, seminar was suspended and special permission from attending classes was given. BVB had made requisite infrastructure arrangements for all the students of AITM. Your unexplained absence has caused massive inconvenience to them and embarrassment to us.

The placement officer of BVB has intimated to the management about their displeasure with the conduct of students and said that in future they would not be invited for any pooled campus placements in BVB.
    
Students by engaging in such an unprofessional conduct have bought disrepute to the department and institution as a whole.  Those who have registered and not attended the placement shall be debarred from all future campus placements and also shall be required to give a written explanation for their conduct. Further action shall be initiated after your response.

   HOD
Dept. CSE
AITM, Belgaum

Wednesday, 26 March 2014

Campus Placement Training - Aptitude

Students of 6th and 8th Semester who are interested to attend campus placement training in Aptitude (quant & Reasoning) are required to come and register their names with CSE Department. 

Last date for Registration is April 2nd 2014.

If you register and fail to attend you shall not be permitted for future training programmes.

                                                               *****

Tuesday, 25 March 2014

Schedule for the Pool Campus Drive ROBOSOFT

Following is the schedule for the Pool Campus Interview by Robosoft at BVB on 28th March(Friday).

Batch Number
Colleges
Timing of Written Test
Venue

Batch 1- 
BVB (62), SDM(98),SKSVMA (29),REC (9), VDRIT(26), KLEIT (64), GIT(60), KLECET,Belgaum (29), AITM (60), JCE (50), MMEC (9), SGBIT (13),
= Total of  509 Students
9.15 am 

BT Auditorium





Batch 2
BLDEA (46), BEC (85), HIT (27), KLECET- Chikodi (17) i.e. Total of 175 students from 2014 Batch + 2013 Batch Students i.e. Pass Out Batch students from ALL colleges

10.30am 

BT Auditorium


All the students should have the following documents with them:

1) SSLC, PUC and all BE  semester marks cards in original (These documents will be returned to you after verification)
2) SSLC, PUC and all BE  semester marks cards in photocopy
3) Identify proof : PAN Card(mandatory) and any one of the following - Voters ID/College ID/Passport /Driving License.
4) Updated CV with signature at the end of the CV. Passport size photograph attached to right corner of the CV.